Page 47 - Sayı-08
P. 47

FORMAL SAFETY ASSESSMENT OF OFFSHORE 45
                                                                                SUPPORT VESSELS

               Proper communication,
               Proper repair

4. Intervention to remove consequence;
               Emergency response drills,
               Emergency instructions,
               Notification to chief engineer/master,
               Abandon ship training,
               Additional fire fighting system (sprinkler etc.)
               Notification to port authorities,
               Implementation of ship specific emergency procedures.

Now, it is time to proceed step 4 cost benefit assessment. Hereby in Table 6, basic calculation for

cost benefit assumption has been shared. This step aims to understand and also compare the

benefits from reduced risks and cost of implementation of RCO as defined in step 3. Following

tables have been created in order to calculate cost - benefit assessment. At first, benefit has been

assumed based on expert opinion, historical data and maintained applications on-board. After this,

a cost has been identified in order to create intervention. Followingly, overall score can be

calculated. In Table 7 and Table 8 cost benefit analysis results have been published. It is

needlessly to say that an orderly fashion is to be created to understand the best intervention in

regard to cost/benefit assessment.

                                 Table 6. Cost benefit description

                         Estimation of benefit ÷ Estimation of Cost  = Overall

Range                    Description          Description            Score

   1                     No benefit           ÷ No cost for implementing = Result
   2
   3                                          Countermeasure
   4
   5                     Low benefit          ÷ Small cost           = Result

                         Medium benefit       ÷ Medium cost          = Result

                         High benefit         ÷ High cost            = Result

                         Very high benefit ÷ Very high cost          = Result

                  Table 7. Cost benefit analysis for collision/contact/allision category

Intervention To Remove Cause                  Benefit                Cost                 Overall
                                                                                          Score
                                              Assessment             Estimation
                                                                                                2
Improve training                                            42                                0.75
                                                                                              1.67
Improve management through company                          34                                1.25

Prohibition of drugs, alcohol                               53                                  1
                                                                                                1
Improving efficiency of surveys                             54                                1.33
                                                                                          Overall
Planned maintenance implementation                          22                            Score
                                                                                              2.5
Improvement on manning                                      55                                  1
                                                                                                2
Using proper and new equipment                              43                                1.5
                                                                                          Overall
Intervention To Remove Incident               Benefit                Cost                 Score
                                                                                                2
                                              Assessment             Estimation                 4
                                                                                                3
Proper communication                                        52

Trained/experienced officers                                55

Better implementation of company regulations                42

Equipment specific training by 3rd companies                32

Intervention To Remove Accident               Benefit                Cost

                                              Assessment             Estimation

Operational specific training                               42

Proper watchkeeping                                         41

Proper loading of cargo                                     31

                                                                                          Sayı 6, 2016 GiDB|DERGi
   42   43   44   45   46   47   48   49   50   51   52