Page 47 - Sayı-08
P. 47
FORMAL SAFETY ASSESSMENT OF OFFSHORE 45
SUPPORT VESSELS
Proper communication,
Proper repair
4. Intervention to remove consequence;
Emergency response drills,
Emergency instructions,
Notification to chief engineer/master,
Abandon ship training,
Additional fire fighting system (sprinkler etc.)
Notification to port authorities,
Implementation of ship specific emergency procedures.
Now, it is time to proceed step 4 cost benefit assessment. Hereby in Table 6, basic calculation for
cost benefit assumption has been shared. This step aims to understand and also compare the
benefits from reduced risks and cost of implementation of RCO as defined in step 3. Following
tables have been created in order to calculate cost - benefit assessment. At first, benefit has been
assumed based on expert opinion, historical data and maintained applications on-board. After this,
a cost has been identified in order to create intervention. Followingly, overall score can be
calculated. In Table 7 and Table 8 cost benefit analysis results have been published. It is
needlessly to say that an orderly fashion is to be created to understand the best intervention in
regard to cost/benefit assessment.
Table 6. Cost benefit description
Estimation of benefit ÷ Estimation of Cost = Overall
Range Description Description Score
1 No benefit ÷ No cost for implementing = Result
2
3 Countermeasure
4
5 Low benefit ÷ Small cost = Result
Medium benefit ÷ Medium cost = Result
High benefit ÷ High cost = Result
Very high benefit ÷ Very high cost = Result
Table 7. Cost benefit analysis for collision/contact/allision category
Intervention To Remove Cause Benefit Cost Overall
Score
Assessment Estimation
2
Improve training 42 0.75
1.67
Improve management through company 34 1.25
Prohibition of drugs, alcohol 53 1
1
Improving efficiency of surveys 54 1.33
Overall
Planned maintenance implementation 22 Score
2.5
Improvement on manning 55 1
2
Using proper and new equipment 43 1.5
Overall
Intervention To Remove Incident Benefit Cost Score
2
Assessment Estimation 4
3
Proper communication 52
Trained/experienced officers 55
Better implementation of company regulations 42
Equipment specific training by 3rd companies 32
Intervention To Remove Accident Benefit Cost
Assessment Estimation
Operational specific training 42
Proper watchkeeping 41
Proper loading of cargo 31
Sayı 6, 2016 GiDB|DERGi